999016 ā Revision G P a g e | 11 of 44
Configuration and Mode: Test setup charging
Mains Terminal Disturbance Voltage
CISPR 11: 2009 A1:2010 EN
55016-2-3: 2004 + A1:2005
Electromagnetic Radiation Disturbance
CISPR 11: 2009 A1:2010
EN 55016-2-3: 2004 + A1:2005
Harmonic Current Emissions (AC
Power Port)
Voltage Fluctuations and Flicker (AC
Power Port)
Immunity to Electrostatic discharge
(Enclosure Port)
Immunity to Radiated RF
Electromagnetic fields (Enclosure Port)
IEC 61000-4-3: 2006 A2:2010
Immunity to Proximity Fields from RF
Wireless Communicatio0n Equipment
(Enclosure Port)
IEC 61000-4-3: 2006 A2:2010
Immunity to Surges (AC Power Port)
Immunity to Electrical Fast Transient /
Burst (AC Power Port)
Immunity to Conduct Disturbances
Induced by RF Fields (AC Power Port)
Immunity to Voltage Dips and Voltage
Variations (AC Power Port)
Immunity to Voltage Interruptions (AC
Power Port)
In-Track charging system stand testing
Immunity to Electrostatic discharge
(Enclosure Port)
Configuration and Mode: Test setup standby
Electromagnetic Radiation Disturbance
CISPR 11: 2009 A1:2010
EN 55016-2-3: 2004 + A1:2005
Immunity to Electrostatic discharge
(Enclosure Port)
Immunity to Radiated RF
Electromagnetic fields (Enclosure Port)
IEC 61000-4-3: 2006 A2:2010
Immunity to Proximity Fields from RF
Wireless Communicatio0n Equipment
(Enclosure Port)
IEC 61000-4-3: 2006 A2:2010
Configuration and Mode: Test set up operating up and down
Electromagnetic Radiation Disturbance
CISPR 11: 2009 A1:2010
EN 55016-2-3: 2004 + A1:2005
Immunity to Electrostatic discharge
(Enclosure Port)
Immunity to Radiated RF
Electromagnetic fields (Enclosure Port)
IEC 61000-4-3: 2006 A2:2010
Immunity to Proximity Fields from RF
Wireless Communicatio0n Equipment
(Enclosure Port)
IEC 61000-4-3: 2006 A2:2010
Configuration and Mode: Test setup standby
General Requirement; Risk
Management Process for ME
Equipment and ME Systems
Identification, Marking and documents