8
Available options in 2400VA model:
22.0V 22.5V 23.0V (default)
23.5V 24.0V 24.5V
25.0V 25.5V
13
Setting voltage point back
to battery mode when
selecting “SBU priority” or
“Solar first” in program 01.
Available options in 1200VA model:
Battery fully
charged
12.0V 12.3V
12.5V 12.8V 13.0V
13.3V 13.5V (default) 13.8V
14.0V
Available options in 2400VA model:
Battery fully
charged
24V 24.5V
25V 25.5V 26V
26.5V 27V (default) 27.5V
28V
16
Charger source priority:
To configure charger
source priority
If this inverter/charger is working in Line, Standby or Fault
mode, charger source can be programmed as below:
Utility first
Utility will char
e battery as first priority.
Solar energy will charge battery only
when utility power is not available.
Solar first
Solar ener
y will char
e battery as first
priority.
Utility will charge battery only when
solar energy is not available.
Solar and utility
(default)
Solar ener
y and utility will char
e
battery at the same time.
Only Solar
Solar ener
y will be the only char
er
source no matter utility is available or
not.