EasyManua.ls Logo

ProSelect FORCEVFO Series - Page 12

ProSelect FORCEVFO Series
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
110547-01 - 4/20
FORCEVFO Installation & Service Manual
Figure 4-1: Recommended Piping for Combination Heating and Cooling (Refrigeration) System
4 Water Boiler Piping and Trim (continued)
To perform a long term pressure test including
the boiler, ALL trapped air must first be
removed from the boiler.
A loss of pressure during such a test, with no
visible water leakage, is an indication that the
boiler contained trapped air.