EasyManua.ls Logo

PullRite 20K OE Series - Installation: Final Assembly; Mounting Rails Attachment; Fifth Wheel Hitch Mounting

PullRite 20K OE Series
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
4. Place the Mounting Rails (ISR) (1) into the
support rail weldments. Lock the base rails
into place with the hitch pin (5) and secure
with the pin clip (8).
5. Once hitch pins and clips are secured, set
your fifth wheel in the corresponding
mounting locations and secure with 1/2"
hitch pins (not included).

Related product manuals