EasyManuals Logo
Home>Quest Engineering>Other>155

Quest Engineering 155 User Manual

Default Icon
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
1-877-420-1330
50Hz Quest 155 Installation, Operation and Maintenance Instructions
4
www.QuestClimate.com
info@QuestClimate.com
1. Intended Application for Quest 155
The Quest 155 is designed to operate in temperatures between 5°C and 35°C.
In order to eciently control humidity levels, the area in which the dehumidifier is to be operated must be free of water
intrusion or excessive fresh (outside) air infiltration. Before installing the Quest 155, water intrusion and air infiltration
problems should be addressed.
2. Registrations
The Quest 155 conforms to CE standards.
3. Specifications @ 26.7°C/60% RH
4037400-XX Quest 155
Blower:
415 CFM @ 0.0" WG
Power: (Watts)
800
Supply voltage:
230 VAC - 1 Phase - 50 Hz.
Current Draw: (Amps)
3.5
Energy Factor: (L/kWh)
3.74
Operating Temp:
5°C Min - 35°C Max
Water Removal: (L/Day)
71
Air Filter: MERV-13
Size: 41cm x 51cm x 5cm
Drain Connection:
3/4” Threaded NPT
Refrigeration Type:
Refrigerant Amount:
R410A
2 lbs, 1 oz
Dimensions:
Width:
Height:
Length:
Weight:
Unit
96cm
56cm
51cm
61 kg
Power Cord:
20’ Fem IEC 60320-C13
4037400-01 UK Cord
BS 1363 (type G)
4037400-02 AUS Cord
AS 3112 (type I)
4037400-03 EU Cord
CEE 7/7 (type E and F)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quest Engineering 155 and is the answer not in the manual?

Quest Engineering 155 Specifications

General IconGeneral
BrandQuest Engineering
Model155
CategoryOther
LanguageEnglish

Related product manuals