1-866-933-7486
Quest Dry RDS 10 Installation, Operation and Maintenance Instructions
4
www.QuestOnTheJob.com
sales@QuestOnTheJob.com
quest
quest
Quest Dry RDS 10 Installation, Operation and Maintenance Instructions
1. Safety Certications
The Quest Dry RDS 10 conforms to unied standard UL 60335-2-40.
2. Specications
Part No. 4029630
Power 5.1 amps, 110-120 VAC, Grounded
Water 80 pints/day @ AHAM (80°F, 60%)
Removal (10 Gallons)
Blower 230 CFM without external ducting
210 CFM @ .15 IWG external static
Refrigerant 1 lb, 6 oz. R410A
Charge
Operating 33°F to 105°F
Range
Filters: 12” x 12” x 1” Pleated Media MERV-8
Duct Intake – 12” Flex-Duct
Options Supply – 10” Lay-Flat
Warranty Five years;
1st year 100% of Parts and Labor
2nd-5th year 100% of Parts of sealed
refrigeration system.
Dimensions Width 20”, Depth 20”, Height 33”
Weight 105 lbs.
Patent 7,246,503
3. Operation
Place dehumidier inside structure, place condensate hose into a drain, or a very large
container, and turn on. To decrease drying times, make sure all windows and doors are
closed to the outside and seal off the wet area from any unaffected areas.
3.1 Transporting
The Quest Dry RDS 10 features a high-impact roto-molded housing which protects the
unit airways, and while loading into vehicles. The unit was designed to make it easy to
stack two high. The wheels of the top unit stack in the indentations of the bottom unit to
provide stability. It is recommended the units are properly secured for transport. The Quest
Dry RDS 10 must always be upright when transported by vehicle. It may be tipped onto its
handle and back for loading and moving by hand.
Figure 1: Quest
Dry RDS 10