EasyManua.ls Logo

Quooker VAQ E Series - Overview of Nordic tap installation; A. Drilling hole; B1. Fitting Nordic tap; C. Connecting water

Quooker VAQ E Series
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
It is recommended that you install the Quooker in the following order:
A. Drilling hole
B1. Fitting Nordic tap
C. Connecting water
D. Connecting waste
E. Connecting tank to Nordic tap
Note: Bear in mind that the tank, inlet combination valve, mixing valve and
socket must remain accessible for servicing.
For an overview of the Fusion tap installation, please refer to the next page
and for the Flex tap to the page after that.
Overview of Nordic tap installation
COLD
Installatieinstr VAQ E UK 30.225.03.V15 11-12-18 09:32 Pagina 8

Related product manuals