EasyManua.ls Logo

Radiant R2KA 20 - Table of Contents

Radiant R2KA 20
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
R2KA 24 /20 - RAD - ING - Manuale - 1806.1_SK.2
R2KA 24.20_EN
SUMMARY
SUMMARY
INTRODUCTION 4
1. INSTALLER SECTION 7
1.1. INSTALLATION 8
1.1.1. GENERAL INSTALLATION WARNINGS 8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS 8
1.1.3. REFERENCE LEGISLATION 9
1.1.4. UNPACKING 10
1.1.5. OVERALL DIMENSIONS 11
1.1.6. JIG 11
1.1.7. POSITIONING AND MINIMAL TECHNICAL SPACES 12
1.1.8. CIRCULATOR PREVALENCE/FLOW DIAGRAM 13
1.1.9. HYDRAULIC CONNECTION 14
1.1.10. D.H.W. CIRCULATING LOOP 15
1.1.11. SYSTEM FILLING 16
1.1.12. FILLING THE CONDENSATE COLLECTION SIPHON 17
1.1.13. ANTI-FREEZE PROTECTION 18
1.1.14. GAS CONNECTION 19
1.1.15. ELECTRICAL CONNECTION 19
1.1.16. POWER SUPPLY 20
1.1.17. OPTIONAL ELECTRICAL CONNECTIONS 21
1.1.18. FUME EXHAUST FITTINGS 23
1.1.19. INSTALLATION MODES 24
1.1.20. TYPES OF FUME EXHAUST SYSTEMS 26
2. SUPPORT CENTRE SECTION 29
2.1. FIRST START-UP 30
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP 30
2.1.2. BOILER COMMISSIONING 31
2.1.3. CO2 VALUE CHECK AND CALIBRATION 32
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS 33
2.1.5. DIGITECH CS PARAMETERS TABLE 35
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM 42
2.2. MAINTENANCE 43
2.2.7. GENERAL MAINTENANCE WARNINGS 43
2.2.8. TECHNICAL DATA 45
2.2.9. TECHNICAL ASSEMBLY 50
2.2.10. HYDRAULIC BOARD 51
2.2.11. 3-WAY VALVE OPERATION 52

Related product manuals