Do you have a question about the Radiant R2K 24 and is the answer not in the manual?
Essential safety precautions and regulatory compliance for installing the boiler.
Specifies required clearances for safe installation and maintenance access.
Guidance on the installation of the mandatory pressure relief valve for safety.
Critical steps and safety warnings for connecting the gas supply.
Critical steps and safety warnings for connecting the electrical power.
Details on connecting the boiler to the main power supply.
Requirements and guidelines for safe and efficient exhaust gas discharge systems.
Initial checks required before the first boiler start-up.
Steps to follow for safely starting and verifying boiler operation.
Procedure for checking and calibrating CO2 levels for optimal combustion.
Essential safety precautions and requirements for performing maintenance.
A list of fault codes, their causes, solutions, and reset methods.
Step-by-step guide for converting the boiler to operate on a different gas type.