EasyManuals Logo

Radiant R2K 24 User Manual

Radiant R2K 24
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
36
R2K 24 - RAD - ING - Inst.Manual - 2002.1_CSA
2. FIRST START-UP
SUPPORT CENTER
2.1. FIRST START-UP
2.1.1. PRELIMINARY OPERATIONS
FOR FIRST START-UP
The first start-up operations consist of checking
the correct installation, adjustment and operation
of the device. Proceed as follows:
Make sure all water lines connected to the boiler
have been thoroughly flushed prior to first used.
It is critical that all installation/ construction
debris has been removed from the system
before firing the boiler for the first time.
Check the inner components and ensure
that they are sealed in accordance with the
specifications provided and by standard and
regulations.
Check if the gas used is suitable for the boiler;
Check if the gas capacity and relative pressures
comply with those on the rating plate;
Check the operation of the safety device in case
of lack of gas;
Make sure that the device supply voltage
corresponds with that on the plate (120 V – 60
Hz) and that the wiring is correct;
Make sure that the grounding system works
properly;
Make sure that the combustion air circulation,
exhaust and condensate discharge take place
properly in compliance with the Local and
National Laws and Standards in force;
Make sure that the venting and their connections
and comply with the requirements of the Local
and National Laws and Standards;
Make sure that the heating system valves are
open;
Make sure that there is no intake of gaseous
products within the system;
Make sure that there are no flammable liquids
or materials near the device;
Open the boiler gas valve and make sure that
there are no gas leaks upstream from the device
(the burner gas connection must be checked
while the unit is running);
In case of new installation of the gas supply
network, the air inside the gas line may lockout
the device at first start-up. Repeat the start-up
procedure to purge all the air inside the gas line.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Radiant R2K 24 and is the answer not in the manual?

Radiant R2K 24 Specifications

General IconGeneral
BrandRadiant
ModelR2K 24
CategoryBoiler
LanguageEnglish

Related product manuals