4.2 Filling the condensate trap
The condensation trap must be pre-filled when
starting the boiler for the first time in order to prevent
flue gases from flowing back through the trap.
The filling operation is carried out as follows (see fig.
1):
Remove plug T and fill the trap S three quarters
full with water;
Replace plug T and connect the drainpipe P into
a condensate discharge trap conforming to
current legislation;
Attention! It is recommended to clean the
condensate trap, after a few months of boiler
operation and periodically to remove any
deposits/residuals that may interfere with correct
operation.
Fig. 1

Other manuals for Radiant RK 18 OV

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Radiant RK 18 OV and is the answer not in the manual?

Radiant RK 18 OV Specifications

General IconGeneral
BrandRadiant
ModelRK 18 OV
CategoryBoiler
LanguageEnglish

Related product manuals