EasyManua.ls Logo

RAS MULTIBEND 9000 - Page 42

Default Icon
263 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RECEIVING. INSPECTION,
TRANSPORT,,
-
C I
EANI
i't
-c,'
t it b=in
l-L
ATtd
t t A t't
o
c o
lvt M I s s
I
o
N I
N
G
RAS
Retaining
joints
<>
O
Retaining
bolt
O
Circlip
Retainer
on the
lower cheek
ATTENTION!
bolts
are inserted
into
the retaining
joints
and
secured
on both
sides
by
two
The two
support
rods
are
then
fitted into
the retainers,
provided
on
the lower
cheek
and the
stop
frame,
and'tire
stop
is
carefully
lowered
into
place
by
the
crane.
The length
of the
support
rods,
which
has
been adjusted
and iixed via
hexagon
locknuts,
must
not be
altered
in order
to ensure
that the stop's
horizontal
position
remains
unchanged.
Retainer
on
the
stop frame
Support
rod
RAS 74.20-40
MULTIBEND
9OOO
3-20
Februar11,1994

Related product manuals