EasyManua.ls Logo

RBI SPECTRUM Series - Page 11

RBI SPECTRUM Series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Finned copper tube gas boilers & water heaters – Boiler Manual
11
Figure 5 Typical Primary/Secondary Piping System
(See Notes)
Figure 6 Low Temperature Piping with Thermostatic Valve
(See Notes)
H-1 Rev 4
H-18 Rev 3
NOTES:
1. For pump selection consult factory.
2. Boiler pump sized to boiler and thermostatic 3-way valve design ow requirements.
3. Boiler circuit piping must be sized large enough to handle maximum ow through unit.
4. All boilers furnished with factory mounted outlet water temperature gauge.
5. Boiler pump purging required. Use terminals supplied.
6. Valve is precalibrated for 140°F return temperature.
Notice: These drawings show suggested piping conguration and valving.
Check with local codes and ordinances for specic requirements.
NOTES:
1. Boiler circuit piping must be sized
large enough to handle maximum
ow through unit.
2. Boiler pump sized to boiler design
ow requirements.
3. All boilers furnished with factory
mounted outlet water temperature
gauge.
4. Boiler pump purging required. Use
terminals supplied.
Notice: These drawings show suggested
piping conguration and valving.
Check with local codes and ordinances for
specic requirements.
Operated Valve
Air Vent
Pressure Switch
Aquastat Union
Gas Pressure
Regulator
Automatic
Thermometer
Flow Switch
Pressure
Relief Valve
Reducing Valve
Self-Operated
Check Valve
Pressure
Va lve
Pump
Motorized Valve
Solenoid
Ball Valve
Bufferfly Valve
Angle Valve
Gate Valve
Globe Valve
Balance Valve
Backflow-
Prevention
Device
3-Way Valve
Expansion
Tank

Other manuals for RBI SPECTRUM Series

Related product manuals