Operating Control
Per DOE mandate, the operating control incorporates an automatic
means (thermal purge) of adjusting the boiler water temperature
for hot water heating. e preferred control seing for potable hot
water is 130°F, 54°C. e operating control should be set to the
lowest seing that will satisfy the consumer's needs.
Seing the thermostat or operating control too high
can result in scalding resulting in severe personal injury!
High Limit (Aquastat)
e high limit is located in the top control area of the boiler/water
heater. A remote capillary bulb is run to a well on the outlet side
of the supply header.
e water heater high limit should be set a minimum of 20°F,
11°C higher than the operating control. Refer to the HOT WATER
SUPPLY section for the proper supply water temperature.
Flow Switch
A ow switch is provided in the water outlet piping to prevent the
boiler/water heater from ring without adequate water ow through
the heat exchanger.
MAINTENANCE
Disconnect electrical power and close the manual gas
shut o valve before performing maintenance or severe
personal injury may result!
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, personal
injury, exposure to hazardous materials or loss of life.
Installation and service must be performed by a
qualied installer, service agency or the gas supplier
who must read and follow the supplied instructions
before installing, servicing or removing this boiler. is
boiler contains crystalline silica materials that have been
identied as carcinogenic or possibly carcinogenic to
humans when inhaled.
AVERTISSMENT: Une instqallation, un réglage, une
réparation ou un entretien non comforme aux normes
peut entraîner des dommages matériels, des
blessures,exposition à des matiéres dangereuses ou la
mort. L’installation et lentretien doivent être eectués
par un installateur ou un service d’entretien qualié ou
le foumisseur de gaz qui doivent avoir lu les in-
structions foumies avant de faire l’installation,
lentretien ou lenlèvement de la chaudière et les
respecter, Cee chaudière contient des matériaux qui
ont été identiés comme étant cancérogènes ou
pouvant lêtre.
Servicing, inspection and adjustment must be done by
a trained technician in accordance with all applicable
local and national codes. Improper servicing or
adjustment can damage the boiler/water heater!
e ceramic combustion chamber contains crystalline
silica. Wear a tightly ed dust mask when removing
the burners or heat exchanger to prevent inhalation
of airborn bers. Crystalline silica bers have been
identied as carcinogenic, or possibly carcinogenic
when inhaled.
e boiler/water heater should be cleaned and inspected once a
year and before each heating season. Make sure that the burners
and ignition components are free from dust, soot, dirt, corrosion
or other deposits that would impair the boiler’s performance. Refer
to page 24 for component identication.
Improper burner servicing can result i
n premature
burner failure voiding the warranty!
Burner Drawer & Burner Removal
1. Close the manual shuto valves in the gas supply lines and turn
o electrical power to the boiler/water heater.
2. Disconnect the gas train from the gas supply piping at the ground
joint union.
3. Remove the ame roll-out shield.
4. Remove the two screws that aach the burner drawer to the
base panel, Figure 12.
5. Disconnect the electrical wires going to the gas valve and burner
drawer.
6. On intermient pilot models disconnect the ignition cable from
the ignition module.
7. Pull the burner drawer out until the burners are fully exposed.
8. Inspect each burner for damage or signs of deterioration. Use
a brush or compressed air to remove any debris from the burner
ports.
9. DO NOT install damaged or badly corroded burners, replace
them.
10. Reinstall the burner drawer and ame roll-out shield following
the removal steps in reverse order.
11. Reconnect all electrical wires.
12. Reconnect the gas piping.