16
7. When first operating the chiller pump, check that the water is
circulating through the chiller without leaks at any of the connections
in the piping.
8. If connecting the chiller to an operating system pay attention to the
drop in water level and refill the tank with freshly mixed salt water at
the same salinity, pH and temp.
8 Installation of LED Modules
Using the M3 screws provided,
attach the swivel connector as
shown in the diagram.
Put the swivel connector pins and
fixing screw within easy reach of the
aquarium. Locate the LED Module in
front of the mounting arm and push
swivel connector in position. Insert
the connector pins to both sides and
push until firmly in position. Screw
the fixing screw into the top of the
connector.
Adjust the position of the LED
module until it is parallel with
the top of the aquarium and
tighten the fixing screw. The
swivel connector allows rotational
adjustment for personal preference
of approximately 5 degrees.