EasyManua.ls Logo

Redback EV480D - ASSEMBLY AND OPERATION; Before Initial Operation; Installing;Removing the Blow Pipe; Installing;Removing the Vacuum Pipe

Redback EV480D
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
ASSEMBLY AND
OPERATION
GENERAL SAFETY
WARNING #1!
Before Initial Operation
Unpack the garden tool and accessories
and check that no parts are missing or
damaged.
NOTE: The batteries (optional;
depending on delivery scope) are not
fully charged on delivery. Prior to initial
operation, charge the batteries fully. See
user manual of the battery charger.
Assembly
Installing/Removing the
Blow Pipe
Tools are not required to install the
blower pipe.
1. Attach the blow pipe into the
connecting piece and secure by turning
it in clockwise direction (bayonet catch
engages).
2. The blower tube can be removed
for storage.
3. Just follow the reverse sequence
of the blow pipe installation to remove
the blow pipe.
Installing/Removing the
Vacuum Pipe
Tools are not required to install the
vacuum pipe.
1. Attach the vacuum pipe into the
connecting piece and secure by turning
it in clockwise direction (bayonet catch
engages).
2. The vacuum tube can be removed
for storage.