OPERATION and MAINTENANCE
B20HPC-SKE-V25 6 of 75
13822 Oaks Avenue
Chino, CA 91710
reedpumps.com
(909) 287 - 2100
LOCKOUT / TAGOUT
The Lockout/Tagout procedure applies to all REED concrete placing equipment.
Before performing any maintenance and/or repair on equipment;
1. Unit must be OFF and the ignition key must be removed from the control panel or
dash.
2. Key must be securely stored in toolbox or with operator performing maintenance.
3. Signage must be posted to indicate machine is currently under Lockout/Tagout.
The following symbol is a reminder to Lock Out and Tag Out equipment before working
on equipment.
GENERAL SAFETY GUIDELINES
Use Only Qualified, Experienced, and Trained Personnel
Wearing Protective Equipment At All Times
For Safe Use, Maintenance, Inspection, and Repair,
Only Operate, Maintain, Inspect, and Repair
In Accordance With This Operation Manual and the Safety Manual
Performance and Safety Features Must Never Be Altered, Disconnected, or Removed
Contact REED Technical Support and Service When Assistance Is Required