EasyManua.ls Logo

REED B Series - Page 72

REED B Series
206 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION and MAINTENANCE
B20HPC-SKE-V25 71 of 75
13822 Oaks Avenue
Chino, CA 91710
reedpumps.com
(909) 287 - 2100
EVERY 250 HOUR MAINTENANCE CHECKLIST
Actual Hours Date / /
#
Maintenance Description
Initials
1
Change hydraulic filters (or change more frequently as indicated by indicator
gauge on filter)
Additional Notes:
2
Check that all electrical wires, cables, terminals, plugs are in good condition
Additional Notes:
3
Change engine oil and filters (see engine manufacturer guide for all engine
requirements) IF REQUIRED
Additional Notes:
4
Check condition of fuel hoses, fittings, and clamps
Additional Notes:
5
Inspect all safety decals to ensure that they are completely visible and legible
6
Perform complete inspection of the controls
7
All toggles in good condition, stay in position or momentarily return to center
8
Control identification in good condition, legible
9
Perform complete inspection of the controls
10
All toggles in good condition, stay in position or momentarily return to center
1
1
Control identification in good condition, legible
12
Gauges in good condition
Additional Notes:

Table of Contents