English Instruction Manual DCD-230
10
6.2. Operation
1. Wear personal protective equipment
2. Test the safety switch (PRCD)
3. Adjust the shoulder rest
4. Open the water stop valve
5. Carefully attach the drill bit as illustrated
6. Adjust the pressure to the composition of the concrete/brickwork