System is well packed for protection during storage and transport.
Instructions for installing the Algarve system according to the manual.
Description of the free-standing single installation type.
Description of the façade mounted Span single installation type.
Description of the façade mounted Pivot single installation type.
Description of the façade mounted Span and Pivot single installation type.
Description of the free-standing coupled installation type.
Description of the façade mounted Span coupled installation type.
Description of the façade mounted Pivot coupled installation type.
Description of the façade mounted Span and Pivot coupled installation type.
Details on the visible mounting base type.
Details on the visible mounting base with side caps.
Details on the invisible mounting base type.
Specific instructions for free-standing installation positioning.
Specific instructions for façade mounted installation positioning.
Instructions for laying out Pivot and Span profiles on the ground.
Identifying and positioning Pivot profiles based on motor bracket holes.
Identifying and positioning Span profiles based on motor side.
Fitting inner cover plates on the coupling beam with sealant.
Installing corner covers and ensuring correct positioning of brackets.
Securing the trim cover to each column with screws.
Sealing the connection zone between profiles and installing endcaps.
Continuing installation of remaining pivot blades.
Securing the installed pivot blades by rotating them.
Mounting the motor bracket onto the profile.
Attaching the driving profile to the motor side blades.
Checking the correct rotation direction for louvre blades.
Setting for sun entering when opening blades.
Setting for sun protection when opening blades.
Installing the fixed louvre blade on the span profile (motor side).
Installing the support profile on the other span side (non-motor side).
Installing the outer louvre blades into the frame.
Attaching the motor to the motor bracket on the Pivot profile.
Mounting the motor onto the driving profile.
Adjusting the blade drive positioning for optimal performance.
Mounting remaining blades onto the driving profile.
Opening control box and connecting S1 to motor.
Initiating motor programming mode via PROG button.
Troubleshooting LED S1 blinking during programming.
Selecting the desired channel on the TELIS remote.
Confirming motor movement by pressing UP/DOWN buttons.
Checking and correcting motor direction using UP/DOWN buttons.
Reversing motor direction using the MY button.
Closing the blades completely.
Confirming the closed blade position.
Determining the antenna's position on the structure.
Drilling a hole for the antenna cable.
Removing the antenna from its protective PVC pipe.
Disassembling antenna components for mounting.
Mounting the antenna vertically on the top cap.
Performing a memory reset for the motor.
Performing a memory reset for LED lighting.
Routing LED blade cables through the frame profile.
Positioning and connecting LED blades.
Verifying proper connection of LED blade connectors.
Installing LED blades similar to standard aluminium blades.
Connecting LED blade connectors to the LED lighting control unit.
Connecting the LED lighting control box to mains power.
Installing the motor cap.
Attaching the cover to the finishing profile.
Fitting the cover on the coupling beam for coupled types.
Routing cables over the coupling beam for coupled types.
Performing a final check of all fixings and blade operation.
Clipping finishing profiles onto the inner sides of columns.
Handing over the user manual to the client.
Fitting sliding blocks onto the sealing profile.
Removing the screen box cover plate.
Unscrewing the bottom bar insert piece.
Removing U bracket to slide out fabric roller tube.
Carefully removing the fabric roller tube.
Positioning the Fixscreen box temporarily.
Note on the orientation of end cap shanks.
Removing the screen box cover plate.
Unscrewing the fabric roller on both sides.
Carefully removing the fabric roller tube.
Positioning the Fixscreen box temporarily in the pivot.
Note on the orientation of end cap shanks.
Routing the power cable to the corner.
Adjusting trolley bolts for level panel hanging.
Ensuring the panel hangs level in the opposite direction.
Ensuring sufficient panel overlap with L bottom guide rails.
Aligning inner and outer frame surfaces for 4-frame systems.
Mounting the upper rail for glass sliding panels.
Mounting the lower rail for glass sliding panels.
Positioning and attaching column brackets.
Installing water drainage components for columns.
Description of water drainage column types.
Attaching the shifted or additional column to the bracket.
Sliding assembly brackets into support profiles.
Aligning support profile ends with assembly brackets.
Drilling holes for setscrews and bolts.
Repeating bracket installation for the bottom of support profiles.
Marking support profile locations on the top beam.
Marking the center of the top beam.
Fixing the top profile to L-brackets.
Marking support profile locations on the top profile.
Marking the center of the top profile.
Fixing support profiles to the bottom of the top profile.
Adjusting blade clamps for single-sided blade installation.
Ensuring the top profile remains horizontal and supported.
Fitting the UpDown light on one or both Pivot sides.
Preparing the UpDown light module for installation.
Attaching the UpDown light module to the pivot gutter profile.
Warning regarding positioning the UpDown light module's bottom.
Tip for positioning the UpDown light module using a clamp.
Cable transit in the Span side finishing profile.
Routing the cable in the frame profile corner.
Warning about the length of the finishing corner profile.
Connecting UpDown module cables to the control box.
Connecting LED control box cables to the motor control box.
Opening the LED control box and identifying outlets.
Initiating LED lighting setup mode via PROG button.
Selecting the desired channel on the TELIS remote.
Confirming LED lighting setup via TELIS remote.
Closing the LED control box.
Selecting remote channel for white LEDs.
Confirming white LED lighting setup.
Selecting RGB channels via LED control box.
Activating RGB lighting via LED control box.
Selecting remote channel for RGB LEDs.
Confirming RGB LED lighting setup.
Reference to page 58 for factory reset instructions.
Mounting the suspension bracket for the beam.
Handling cable interference during beam suspension.
Disassembling RTS receiver for bracket access.
Disassembling amplifier/Bluetooth for bracket access.
Disassembling loudspeaker for bracket access.
Overview of possible Heat/Sound Beam configurations.
Using the provided Quickon connector.
Connecting the power cord to the Quickon connector.
Stripping conductors of the 3G15 power cable.
Preparing the ground conductor for the cable gland nut.
Placing conductors in the coded transit.
Correctly routing earth conductor and other wires.
Trimming protruding conductor ends.
Fitting the QUICKON cable gland nut.
Ensuring correct correspondence between QUICKON and PHOENIX connectors.
Ensuring proper connection and strain relief with fast connection technology.
Note on checking the device's power supply.
Selecting the desired channel on the TELIS remote.
Confirming heating element function via remote buttons.
Programming the RTS remote to the heating receiver.
Overview of sound Beam connection without amplifier.
Note on loudspeaker impedance requirements.
Connecting SOUND module and supplied cables to connector.
Ensuring cables are fully inserted into the connector.
Pushing the connector covers into place.
Overview of sound Beam connection via Bluetooth.
Overview of sound Beam connection with multiroom system.
Loudspeaker setup for beams with amplifier/Bluetooth.
Routing the power cord for the amplifier.
Disassembling amplifier module if bracket is obstructed.
Connecting amplifier power to the 3G15 power cord.
Stripping conductors of the 3G15 power cable.
Preparing the ground conductor for the cable gland nut.
Placing conductors in the coded transit.
Correctly routing earth conductor and other wires.
Trimming protruding conductor ends.
Fitting the QUICKON cable gland nut.
Ensuring correct correspondence between QUICKON and PHOENIX connectors.
Ensuring proper connection and strain relief with fast connection technology.
Connecting loudspeaker cables using the provided connector.
Ensuring cables are fully inserted into the connector.
Pushing the connector covers into place.
Overview of sound Beam connection via Bluetooth.
Overview of sound Beam connection with multiroom system.
Installing the BEAM's cover lids.
Connecting the cabling after cover installation.
Turning on the heating for a functional check.
Performing a final check of all fixings.
Checking blade rotation.
Advising to stick the rain sensor to the Algarve structure.
Selecting the position for the rain sensor on the fixed blade.
Opening the motor control box.
Connecting the rain sensor cable.
Mounting the silicone ring for the rain sensor.
Fixing the rain sensor to the Algarve structure.
Note on fixation tape and silicone adhesion.
Positioning the wind sensor in an open area.
Connecting the wind sensor to a 230V power supply.
Programming the wind sensor.
Note on programming multiple wind sensors.
Programming the wind sensor via the 'program' button.
Resetting the wind sensor to default settings.
Fixing mounting brackets to the frame profile.
Fitting the corner piece to the cornice.
Placing the first cornice over support brackets.
Checking the distance between frame and diagonal cornice side.
Fixing angle brackets to the top corners of cornices.
Securing cornices from the topside.
Filling gaps around angle brackets with sealant.
Assembling the two-part motor cover.