HEAT PUMP AND TANK ASSEMBLY
11
ASSEMBLY PROCEDURE
Warning: The heat pump must be assembled, plumbed and filled with
water prior to power being connected and switched on.
The following procedure should be followed to properly lift, place and connect
the heat pump module onto the storage tank:
1. Storage Tank: Remove all packaging including the carton base from the
storage tank and position in its intended location, supported by a stable
base.
The water connections are on the left hand side and should be parallel to
the wall, unless the water heater is to be installed in a manifolded bank of
water heaters. If the water heater is installed in a manifolded bank of water
heaters, refer to “Multiple Installations” in the Owner‟s Guide and
Installation Instructions supplied with the storage tank for information on
the correct storage tank orientation.
The storage tank is to be positioned at least 100 mm from the wall and
such that when the heat pump module is in position on top of the storage
tank, there is a clearance of at least 300 mm perpendicular from both the
air inlet and outlet louvres to any wall or obstruction.
Ensure the power cable and tank sensor cable are hanging down the
side of and not sitting on top of the storage tank before lifting the heat
pump module into position.
Dimensional Drawing
Heat Pump Air Sourced Electric Boosted Water Heater.
Step 1
position storage tank at least 100 mm from the wall
and allow for at least 300 mm ventilation clearance