EasyManua.ls Logo

Rheem 310 - Heat Pump Operation Faults

Rheem 310
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HEAT PUMP AND TANK ASSEMBLY
14
6. Heat Pump Module Placement: Using two people, one person on each
lifting bar, lift the heat pump module and place it on the top of the storage
tank.
It is recommended to place the hands under the bar to enable the lift in a
curl action.
Ensure the two water fittings on the storage tank pass through the
openings marked “INLET” and “OUTLET” on the heat pump module
chassis.
Ensure the three screw holes in the bottom plate of the chassis are
lined up with the three nutserts in the top of the storage tank.
Take care to avoid resting the heat pump module on the power cable or
the tank sensor cable.
Final positioning is best undertaken with the lifting bars still in position.
CAUTION: The heat pump module weighs approximately 48 kg. This
operation should be performed carefully by two people and good
lifting practice should be followed.

Other manuals for Rheem 310

Related product manuals