EasyManuals Logo

Rheem 95P series User Manual

Rheem 95P series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
Field Conversions
Notes:
ST-A1194-33-02
__ ALL DRAIN PORTS ARE PLUGGED
__ UNIT HAS FORWARD PITCH
__ HEAT TAPE INSTALLED(IF REQUIRED)
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT A
LL HOSES ARE FREE OF KINKS
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
Checklist:
6
HOSE E
6c
HOSE F
6d
ROTATE
UNIT 90°
6a - ROTATE UNIT 90°
6b - CUT 1/4" VENT HOSE TO FIT (APPROX. 5-1/2") AND INSTALL AS SHOWN
6c - CUT HOSE E AT LINE 1- INSTALL
NOTE: MAKE SURE CUT IS STRAIGHT AND SQUARE
6
d - CUT HOSE F ON LINE CORRESPONDING TO UNIT WIDTH AND INSTALL
NOTE: 17.5": LINE 1, 21": LINE 2, 24.5": DO NOT CUT
INSTALL
CUT
CUT
INSTALL
NOTE: REMAINING STEPS SHOWN WITH FURNACE IN HORIZONTAL RIGHT ORIENTATION
NOTE:
USE SOAPY WATER TO FACILITATE EASY
HOSE AND TUBE ASSEMBLY
1/4 TUBE CUT
TO FIT
APPROX. 4
6a
6b
33

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rheem 95P series and is the answer not in the manual?

Rheem 95P series Specifications

General IconGeneral
BrandRheem
Model95P series
CategoryGas furnace
LanguageEnglish