Field Conversions
ST-A1194-35-01
Notes:
Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DI
RECTION OF WATER FLOW.
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE FLUE TRANSITION
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE
GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ ALL DRAIN PORTS ARE PLUGGED.
__ UNIT HAS FORWARD
PITCH.
__ HEAT TAPE INSTALLED(IF REQUIRED)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rheem 95P series and is the answer not in the manual?

Rheem 95P series Specifications

General IconGeneral
BrandRheem
Model95P series
CategoryGas furnace
LanguageEnglish