EasyManua.ls Logo

Rheem RTG-70DVLP-3 - Installation Checklist

Rheem RTG-70DVLP-3
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51
Installation Checklist
Indoor water heaters must be installed indoors�
Outdoor water heaters must be installed outdoors�
Close to area of ventilation termination
(indoor models)�
Protected from freezing temperatures�
Proper clearance from combustible material
observed�
Sufficient fresh air supply for proper operation of
water heater
Air supply free of corrosive elements and flammable
vapors�
Provisions made to protect area from water
damage�
Sufficient room to service heater
Combustible materials, such as clothing, cleaning
materials, and rags, clear of the heater and vent
piping�
Water heater is properly attached to the wall�
A. Water Heater Location
B. Coaxial Vent (Indoor Models)
Vent pipe material is Category III and is
manufacturer-approved�
Horizontal vent runs have 1/4 in� per foot of
DOWNWARD slope towards the vent terminal�
Vertical venting is installed as described in the
"Vertical Vent Installation" section�
Connector(s) securely fastened together with high-
temperature silicone (500°F [260°C]) and airtight�
All coaxial vent runs are properly installed�
Vent terminal is properly installed�
Maximum vent length is observed�
Water supply has sufficient pressure�
Air has been purged from the water heater and the
piping�
Water connections tight and free from leaks�
Water filter is clean and in place�
All piping has been assembled as described on
"Water Supply"�
Water pipes are insulated and protected from
freezing, if necessary
Pressure-relief valve properly installed with
discharge line running to open drain�
Discharge line protected from freezing, if necessary
C. Water Supply/Relief Valve
Gas type matches listing on rating plate�
Gas supply pressure is sufficient for the water
heater
Gas line equipped with shut-off valve, union, and
sediment trap as described on "Gas Supply System"�
Approved pipe-joint compound has been used on all
gas pipe connections�
All connections and fittings have been checked for
leaks with a soapy water solution�
Gas company inspected installation (if required)�
D. Gas Supply
Supply cord and/or wiring meets all local codes,
National Electrical Code, ANSI/NFPA 70, in the U�S�,
or Canadian Electrical Code, CAN/CSA C22�1, Part
1, in Canada�
Voltage matches listing on rating plate�
Water heater is properly grounded�
E. Electrical Wiring
Drain hose is attached to the condensate collector,
and condensate is drained as described on
"Draining Vent Condensate"�
F. Condensate
Checklist
INSTALLATION INSTRUCTIONS

Related product manuals