Do you have a question about the Riello AARIA MULTI 475 MN and is the answer not in the manual?
Determining the installation location, minimum distances, and environmental considerations.
Step-by-step guide for connecting refrigerant lines, including safety checks.
Procedures for electrical connections, power supply checks, and grounding requirements.
Steps for initial startup, safety checks, and refrigerant gas tagging.
Determining the installation location, minimum distances, and environmental considerations.
Step-by-step guide for connecting refrigerant lines, including safety checks.
Procedures for electrical connections, power supply checks, and grounding requirements.
Steps for initial startup, safety checks, and refrigerant gas tagging.
| Category | Air Conditioner |
|---|---|
| Cooling Capacity | 4.75 kW |
| Energy Efficiency Ratio (EER) | 3.21 |
| Coefficient of Performance (COP) | 3.61 |
| Refrigerant | R32 |
| Noise Level (Outdoor Unit) | 52 dB(A) |
| Type | Multi-Split |
| Heating Capacity | 5.2 kW |
| Power Supply | 230V / 50Hz |