19
*All page numbers refer to Section 2, unless otherwise noted.
1. Reference to leftor rightand forwardor rearare always determined from the rear of the ma-
chine facing the direction of forward travel.
2. Refer to page 2, 7 and 42 for detailed wing, centre frame drawings and wing list.
3. Place the drum shaft into the drum cross (item 27, page 2) using the three capscrews and lock
washers. (items 7, 17, page 2).
4. Place the two end caps on the drum ends using the capscrews, flats washers and lock washers
(items 8, 15, 18 and 28, page 2).
5. Use a hoist or tractor to set the completed wing (page 2) or centre frame (page 7) assembly onto
the drum, lining up the drum lug on the frame with the drum shaft.
6. Put a good even coat of anti-seize on the drum shafts (items 27, page 2).
7. Now place the drum bearings onto the drum shafts (items 6, page 2).
8. Next, insert the four capscrews and flat washers (item 13 & 16, page 2) through the holes on the
bearing (item 6, page 2) and the frame drum lug. Place stovers on the bolts and tighten, check
torque according to torque chart.
1. Refer to page 3 for detailed drawing, if finish drum is pre-assembled make sure drum is centred on
frame and set screws are tight.
2. Unit must be in transport position to install finish roller springs.
3. Put a good even coat of anti-seize on the finish roller drum shafts.
4. Use a hoist or tractor to set the finish drum mount weldment with the finish roller drum weldment
shaft (item 1, 2 & 3).
5. Now place the drum bearings onto the drum shafts, centre in frame. (items 3 & 5).
6. Next, insert the capscrews through the holes on the bearing and the frame drum lug (items 17, 12
& 22), tighten all capscrews, stovers and set screws.
7. Attach the finish roller left and right wing attachment weldments using 5/8” x 2” capscrews and 5/8”
stover lock nuts (items 2, 9 & 11).
8. Place finish roller spring on to finish roller drum mount weldment (items 8, 19 & 23).
9. Bolt the finish roller drum mount weldment to the finish roller left or right wing attachment weldment
using 1” x 5” (cut to 3-3/4”) capscrew and stover lock nut (items 13 & 18).
10. Place finish roller spring tensioning weldment on the finish roller spring pin weldment (item 5 & 19).
11. Repeat for all finish roller assemblies. (5 & 7 sections only).