EasyManua.ls Logo

Rivacold CO2NNEXT - Page 49

Rivacold CO2NNEXT
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
rev.01
EN
107 / 293
N.B.: For softwares preceding the Hecu CO2 r3.0.012 version and for machines manufacturerd before OCTOBER 2018,
proceed as follows:
Move down with the key
until "b. Manual Management” is highlighted, then press the
key
Press the key
until the cursor is positioned on "L1
Discharge:". At that
point, press one of the arrow keys to switch from DIS to EN.
Then again the ENTER key until the cursor is in the top left.
Pressing the key,
until the cursor is positioned as shown in the figure.
Pressing the key.
The percentage value is 100%.
Confirm by pressing the key
Only perform this operation in the TN units.
At this point, if the wiring has been carried out correctly, the HPV and VFL valves (if present) will move to
the maximum opening until the Time-out time is reached or until the initial situation is restored placing DIS
in mask Bb01.
If there is a cell control (MPX Pro or Ultracella) connected to the unit, it is al
so possible to force the
electronic thermostatic valve.
Pressing the key,
until the cursor is positioned as shown in the figure.
Pressing the key.
The percentage value is 100%.
Confirm by pressing the key
Press the key until returning to the main page

Related product manuals