EasyManua.ls Logo

Roban EC-135 - Mechanics Assembly; Rotorhead Assembly; Tail Boom Assembly

Roban EC-135
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AssemblyMechanics
Themechanicsarealmostentirelypreassembledandsplitupintofoursections:rotorhead,mainframe,tailframeandtailtube.
Prior to the installation into the scale fuselage, the mechanics have to be entirely assembled, electronic components installed,
adjustedandtested.Afterinstallationintothefuselagemostofthehelicoptermechanic
becomeinaccessible.
Step1Rotorhead
Slide the rotorhead onto the main shaft. Use screw (70
00006) and nylon nut (7000007) to secure the rotorhead
onto the main shaft. Use two screws (7000008) to
additionallyclampuptherotorhubontotheshaftasshown.

Makesurethedistancebetweentheball
linkand theL lever
is equally at 24mm. Finally snap on the ball links (7000025)
ontheswashplate’supperdiscunilinks(7000030).

Step2Tailboom
First of all install the center bearings (7000100) with the
holders (0202006) into the tail boom (7000095). Distribute
the bearings evenly in the tail boom. It is recommended to
apply a bit of lubrificant onto the tubes inner surface,
elsewise the bearing is likely to get stuck before
the correct
position is reached. Then install the center support ring
(600UH1007),theservorodguides(7000040)andtheservo
twotail servo holders(7000098).Installthetail torquetube
(7000096)intothetailtube.
Then insert the tail boom into the tail boom holders (70
00093, 7000094). Lock the tube in place with screw M3x8
(7000086) via the clamp up and additionally with screw
M3x6(7000053)asshown.Installthecarbonsupportbeams
(70001047000106) on the main frame and the tail boom
tailboomclamp(600UH1007).


Other manuals for Roban EC-135

Related product manuals