EasyManua.ls Logo

Roban EC-135 - Swashplate Linkage Adjustment; Motor and Belt Installation

Roban EC-135
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step5–Adjustswashplatelinkages
ThelinkagesfromtheL‐Leversto theswashplatehavetobe
set at correct length. Distances are uniball center to uniball
center:1=35mm

Step6–MotorandBeltinstallation
In order to install the motor, you must first disassemble one
of the side frames in order to have access to the mounting
screws and access to the belt drive. Hence one side frames
fasteners are not tightened upon delivery. Before installing
thepinionpulleyonthemotor,youhaveto
addaflattothe
motorshaftinordertosecurethepulleywiththesetscrews
(70‐).
Mount the motor as shown using washers and screws onto
the motor mount (70‐00066). Make sure to have the motor
wireoutletfacingintotherightdirectionfor
connectingthem
totheESC.Theninsertthebeltpulleyintothebeltandslideit
onto the motor shaft. Before you tighten the set screws,
make sure that the pinion is installed leveled with the belt
pulley,thedistance(Fig.1)isat24.5mm.
Usebothtensioningscrewsto
tensionthebeltdrive.Thebelt
mustn’tbetensionedtootighttoavoidunnecessarywear.
Afterinstallationofthemotor,reassemblethesideframes.

Fig.(1)