EasyManua.ls Logo

ROBBE AMPLITUDE - Installation, Tuning, and Operation; Installation and Tuning Process

ROBBE AMPLITUDE
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
17
Instructions and User Manual
08
ARF
This way a mechanical locking is achieved during full
deection downwards by the linkage running in line with
the servo arm.
09
ARF
For electrical connection between fuselage and wing,
please use the reliable 6-pin multiplex plugs and sockets
and solder them to the ends of the servo cables and the
corresponding opposite side to the receiver. Ensure clean
and correct soldering and insulation.
INSTALLATION AND TUNING PROCESS, ARF/PNP
01
ARF PNP
Turn on the transmitter using the preset model memory
and connect the battery. Also connect the wing cables to
the receiver.
02
ARF PNP
Mount the wing on the fuselage. Make sure that no cables
are trapped between the fuselage and the wing!
03
ARF PNP
First, as far as possible, adjust all rods mechanically. Then,
the control and adjustment of the servo directions and
travel ways as shown in the table below.
04
ARF PNP
Finally, the servo covers are glued with UHU Por.
05
ARF PNP
The center of gravity (CG) is 68-72mm behind the leading
edge. For beginner-compatible ight behavior, rst set
the center of gravity to 68mm by moving the battery. For
performance-optimized Hotliner behavior, the center of
gravity can slowly be moved further back.

Related product manuals