EasyManua.ls Logo

Rokenbok Young Engineer Start Set - Final Assembly;Stringing Gear Crane

Rokenbok Young Engineer Start Set
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B.
A.
C.
40
Note: Cut the second string
in half before you begin. You
will need both halves.
A. Axle Spool: Lifts lighter loads quickly.
Tie the string around the middle of the
axle spool and activate the Axle Drive.
Route the string up and over
the outer pulley.
Bring the string down and attach it
to the Elevator (Step C).
B. Wheel Spool: Lifts heavier loads slowly.
Note: Use the ROK Star Directional Wheel to operate the Axle Drive.
C. Elevator
Tie the string around the middle of
the large wheel spool.
Bring the string down and attach it
to the Elevator (Step C).
Feed the string through both green
arches and tie it to itself.
FINAL ASSEMBLY/STRINGING GEAR CRANE

Related product manuals