EasyManua.ls Logo

ROPV R8040B600S User Manual

Default Icon
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
HARBIN ROPV INDUSTRY DEVELOPMENT CENTER
8 Inch High Pressure Side Port FRP Pressure Vessels
User Manual
Models:
R8040B600S/R8040B1000S/R8040B1200S
Headquarters
Tel(+86)451-82267301
Fax(+86)451-82267303
Email: ropv@ropv.com.cn
Website: www.ropv.com.cn
Global Market
Phone(+1)925-237-0184
Fax(+1)925-264-1951
Email: globalmarket@ropv.com.cn
Website: www.ropv.com.cn
Question and Answer IconNeed help?

Do you have a question about the ROPV R8040B600S and is the answer not in the manual?

ROPV R8040B600S Specifications

General IconGeneral
BrandROPV
ModelR8040B600S
CategoryIndustrial Equipment
LanguageEnglish

Summary

Product Certifications

ASME Authorization

ASME certification for manufacturing Class I reinforced plastic pressure vessels.

UL Listing for Water Components

UL listing for drinking water system components.

CE Marking Compliance

CE certification for pressure equipment meeting safety directives.

WRAS Potable Water Approval

WRAS approval for materials contacting potable water.

Chapter 1 General Product Description

Product Identification and Specifications

Details on model identification, operation specifications, and usage precautions.

Chapter 2 Installation

Installation Procedures

Step-by-step guide for proper installation of the pressure vessel.

Chapter 3 Piping Connections

Permeate and Feed/Concentrate Ports

Guidelines for connecting permeate and feed/concentrate ports safely.

Chapter 4 Maintenance Guide - Part 1

Preventive Maintenance and Vessel Opening

Procedures for routine maintenance and safely opening the vessel.

Chapter 4 Maintenance Guide - Part 2

Head Disassembly and Assembly

Detailed steps for disassembling and reassembling the vessel head.

Chapter 4 Maintenance Guide - Part 3

Component Cleaning and Inspection

Instructions for cleaning and inspecting metallic and non-metallic components.

Chapter 5 Loading/Replacing Membrane Elements

Membrane Element Handling Procedures

Guidelines for loading and unloading membrane elements.

Chapter 6 Closing the Vessel

Pre-Closing Inspection Checklist

Verification steps before closing the vessel to ensure correct assembly.

Chapter 7 Handling and Storage

Handling Precautions and Storage

Best practices for handling, moving, and storing the pressure vessels.

Chapter 8 Breakdowns and Solutions - Part 1

Locking Kit and Head Issues

Troubleshooting guide for locking kit segments and vessel head problems.

Chapter 8 Breakdowns and Solutions - Part 2

Vessel and Sealing Surface Issues

Solutions for vessel corrosion, cracking, and sealing surface leaks.

Chapter 8 Breakdowns and Solutions - Part 3

Feed/Concentrate Port and Permeate Water Quality

Addressing feed/concentrate port issues and low permeate water quality.

Chapter 9 Service Guide

Warranty and Technical Support

Information on quality warranty, technical support, and service coverage exclusions.

Appendix I Pre-Running Checklist

Installation Verification Checklist

Checklist for verifying correct installation of membranes, vessel, and piping.

Appendix II Maintenance Checklist

Maintenance Inspection Items

Checklist for inspecting corrosion, deterioration, damage, and leakage.

ROPV Limited Warranty

Warranty Terms and Exclusions

Details warranty period, coverage, exclusions, and claim procedures.

Related product manuals