EasyManua.ls Logo

RS SAILING Feva - Page 16

Default Icon
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
• When the mainsail is at the top of the mast,
lead the halyard tail that you have been pulling around
the outside of the shroud, and pull it forward.
• Pull the halyard towards the back of the boat,
until it locks in the cleat at the top of the mast.
• Once the halyard is cleated, bring it back around the shroud.
g)
h)
i)
j)
• Take the Ingleeld Clip and thread the end of the halyard through the hole.
• Clip the Ingleeld Clip on to the one attached to
the elastic by the mast gate.
• Pull the halyard through the Ingleeld Clip until all the
slack has been taken up.
•Tie a gure-of-eight knot here to keep the clip in place.
3.8 - Hoisting the Mainsail

Related product manuals