EasyManua.ls Logo

RS RS100 - Page 9

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Take the gennaker halyard from where it exits on top of the mast gate organiser and
thread it through the hoist block that is above the point where the shrouds attach to
the mast. Run the gennaker halyard back down to the base of the mast, passing
through the little shockcord retaining loop at the spreaders. (if fitted).
The mast is now ready to be stepped.

Related product manuals