EasyManua.ls Logo

Rubbermaid 5L10 - User Manual

Rubbermaid 5L10
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in your yard make sure you choose an area with easy access and one that provides
proper drainage for water to run away from the shed location.
BEFORE YOU BEGIN – PREASSEMBLY
Thoroughly review all assembly steps (it is important that
the steps are followed in the correct order). Review the
parts list and make sure that no parts are missing.
IMPORTANT – DO NOT RETURN TO THE STORE
For assistance with your Rubbermaid Storage Building
or for additional product information call our toll-free
Consumer Service number: 1-888-895-2110
M–F: 8:30 a.m. to 5:00 p.m. EST
or visit us online at: www.rubbermaid.com.
Installation Steps:
1. Site Preparation
2. Floor
3. Walls
4. Roof & Doors
5. Finishing
5L10
7T53
76 ¾"
27 ½"
55 ¼"
2028019
Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service
Department can accurately and quickly assist you if necessary.
Question and Answer IconNeed help?

Do you have a question about the Rubbermaid 5L10 and is the answer not in the manual?

Summary

Site Preparation Guidelines

Building Codes and Regulations

Check local building codes, ordinances, restrictions, and neighborhood governances before assembly.

Shed Surface Preparation

Ensure proper assembly and performance by building on a solid, level surface like concrete or a treated-wood platform.

Shed Location Selection

Choose an area with easy access and proper drainage for water to run away from the shed location.

Pre-Assembly Checks

Review all assembly steps in order and check the parts list to ensure no parts are missing.

Floor Installation Steps

Prepare Wall Slot Tabs

Cut wall slot tabs using a utility knife and knock them out with a rubber mallet and screwdriver.

Prepare Hinge Tabs

Knock out tabs for door hinges using a rubber mallet and screwdriver on the front floor panel.

Drill Pilot Holes for Floor

Drill pilot holes through the top surface of the floor for specific locations on the front floor.

Wall Panel Installation

Front Left Side Panel (G) Installation

Prepare screw holes, drill pilot hole, and snap Front Left Side panel (G) into Front Floor (A).

Left Back Panel (D) Installation

Prepare screw holes, connect Left Back panel (D) to Front Left Side (G), and engage floor snaps.

Front Right Side Panel (H) Installation

Prepare screw holes, drill pilot hole, and snap Front Right Side panel (H) into Front Floor (A).

Right Back Panel (F) Installation

Prepare screw holes, connect Right Back panel (F) to Front Right Side (H), and engage floor snaps.

Install Wall Connectors

Install 5 Wall Connectors (WC) to connect the Left Back and Right Back Panels (D and F).

Roof and Door Installation

Install Front Roof Panel

Install the Front Roof panel (J) onto side sections, aligning tongues on top of side walls into roof grooves.

Position and Secure Roof Brace

Position Roof Brace (RB) onto side walls, lower roof, align brace into Front Roof pocket and secure with screws.

Install Shed Doors

Install Left Door (L) and Right Door (K) into hinge openings of the Front Floor (A) and Front Roof (J).

Secure Roof to Side Walls

Install four screws (AA) into the roof, two on each side wall, passing through the Roof Brace (RB).

Finishing and Door Installation

Secure Walls to Floor

Install screws (AA) into 6 locations at the bottom of wall panels to secure walls to the floor.

Install Lock Hasp

Install the Lock Hasp (X) into the opening on the Right Door (K).

Install Door Handle

Install the Door Handle (T) onto the Left Door (L) using four screws (AA).

Maintenance and Safety

Regular Stability Checks

Periodically check the shed to ensure it remains stable and the site remains level.

Anchoring in High Winds

In high wind areas, anchor the shed to a platform or ground using proper fasteners.

Cleaning and Care

Wash the shed with a garden hose or mild detergent; avoid abrasive cleaners.

Storage and Usage Precautions

Do not store hot items, lean heavy items against walls, keep doors closed, and do not climb on the roof.

Summary

Site Preparation Guidelines

Building Codes and Regulations

Check local building codes, ordinances, restrictions, and neighborhood governances before assembly.

Shed Surface Preparation

Ensure proper assembly and performance by building on a solid, level surface like concrete or a treated-wood platform.

Shed Location Selection

Choose an area with easy access and proper drainage for water to run away from the shed location.

Pre-Assembly Checks

Review all assembly steps in order and check the parts list to ensure no parts are missing.

Floor Installation Steps

Prepare Wall Slot Tabs

Cut wall slot tabs using a utility knife and knock them out with a rubber mallet and screwdriver.

Prepare Hinge Tabs

Knock out tabs for door hinges using a rubber mallet and screwdriver on the front floor panel.

Drill Pilot Holes for Floor

Drill pilot holes through the top surface of the floor for specific locations on the front floor.

Wall Panel Installation

Front Left Side Panel (G) Installation

Prepare screw holes, drill pilot hole, and snap Front Left Side panel (G) into Front Floor (A).

Left Back Panel (D) Installation

Prepare screw holes, connect Left Back panel (D) to Front Left Side (G), and engage floor snaps.

Front Right Side Panel (H) Installation

Prepare screw holes, drill pilot hole, and snap Front Right Side panel (H) into Front Floor (A).

Right Back Panel (F) Installation

Prepare screw holes, connect Right Back panel (F) to Front Right Side (H), and engage floor snaps.

Install Wall Connectors

Install 5 Wall Connectors (WC) to connect the Left Back and Right Back Panels (D and F).

Roof and Door Installation

Install Front Roof Panel

Install the Front Roof panel (J) onto side sections, aligning tongues on top of side walls into roof grooves.

Position and Secure Roof Brace

Position Roof Brace (RB) onto side walls, lower roof, align brace into Front Roof pocket and secure with screws.

Install Shed Doors

Install Left Door (L) and Right Door (K) into hinge openings of the Front Floor (A) and Front Roof (J).

Secure Roof to Side Walls

Install four screws (AA) into the roof, two on each side wall, passing through the Roof Brace (RB).

Finishing and Door Installation

Secure Walls to Floor

Install screws (AA) into 6 locations at the bottom of wall panels to secure walls to the floor.

Install Lock Hasp

Install the Lock Hasp (X) into the opening on the Right Door (K).

Install Door Handle

Install the Door Handle (T) onto the Left Door (L) using four screws (AA).

Maintenance and Safety

Regular Stability Checks

Periodically check the shed to ensure it remains stable and the site remains level.

Anchoring in High Winds

In high wind areas, anchor the shed to a platform or ground using proper fasteners.

Cleaning and Care

Wash the shed with a garden hose or mild detergent; avoid abrasive cleaners.

Storage and Usage Precautions

Do not store hot items, lean heavy items against walls, keep doors closed, and do not climb on the roof.

Rubbermaid 5L10 Specifications

General IconGeneral
MaterialPlastic
ColorClear
Lid TypeSnap-on
StackableYes
Dishwasher SafeYes
Freezer SafeYes
Microwave SafeYes

Related product manuals