EasyManua.ls Logo

Runxin 51240B (F112BS) - Page 9

Runxin 51240B (F112BS)
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODEL 51240B/53540B/53640B/61240B/63540B/63640B
5
installed on the inlet to increase the system water feeding pressure, this
cut-off will cause pressure on inlet rising too fast to damage the valve.
Pressure relief output can be used to avoid this problem. (Application
refers to Figure3-10)
All parameters can be modified
According to the water quality and usage, the parameters in the
process can be adjusted.
Two meter types for option (Suit for 63640B/53640B)
Mode
Name
Instruction
A-01
Meter
Delayed
Regenerate on the day although the available
volume of treated water drops to zero (0).
Regeneration starts at the regeneration time.
A-02
Meter
Immediate
Regenerate immediately when the available
volume of treated water drops to zero (0).
Maximum interval regeneration days Suit for 53640B/63640B
Under the situation of service reaching the setting days and the
volume not yet, it could enter into regeneration process forcibly when
current time is the same as regeneration time.
1.3. Service Condition
This valve should be used under the below condition
Requirement
Working
conditions
Water pressure
0.2MPa0.6MPa
Water
temperature
5℃~50
Working
environment
Environment
temperature
5℃~50
Relative
humidity
≤95%25
Electrical facility
AC100240V/5060Hz

Related product manuals