EasyManua.ls Logo

Runxin RL-R150 - Notice; Pre-installation and Operation Precautions; Water Quality and Pretreatment; Brine Tank Maintenance

Runxin RL-R150
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
9. Notice
Before reading and understanding the user manual, please do not operate the device.
Before installation and trial test the product, please take out the spare parts kit and filling material
from the cabinet(See the below picture).
To ensure normal operation of the product after installed, please consult with professional
installation or repairing personnel before use it.
Forbid installing the device near heat source or take anti-heat protective measures when install
near the heat source. It is also forbidden to connect the device with the hot-water pipeline or the pipeline
with the possibility of hot-water returning. Forbid the product under the temperature lower than 1.
Protect resin from freezing which may result in resin broken and disabled.
If the raw water fails to meet the standards of local tap water, such as the sediment concentration
or residual chlorine content exceed the stand, etc., the pretreatment device should be installed before
the device.( Such as Y type filter, ultra filter, and so on.)
During the operation, please check the brine tank regularly to ensure there is brine in the tank.
And when adding brine, please make sure that salt level is higher than water level (see picture). When
the salt level is lower 1/3 of water level(see picture ) , please add in time. (Attention: Make sure the
dissolving salt time is more than 6 hours so as to make the brine saturate)

Other manuals for Runxin RL-R150

Related product manuals