7. Installation Step
Before installation, be sure all these tools and materials listed below are ready:
Electronic hand drill 1 piece (matching with Φ6 masonry drill and tile drill, each 1 piece),
cross screwdriver 1 piece, hammer 1 piece, pipeline clamp several pieces, thread seal
tape several pieces.
8. Operation and Setting
1. Display
a) Under service position, figure 1A, 1B, 1C display circularly 10 seconds.
b) Under service position, figure 1A displays residual water (For example: L02.0:
residual water 02.0m
3
.L00.0: start to backwash at next 2am).
c) Under service position, figure 1B displays the current flow rate (15: the current flow
rate is 15L/min).
d) Figure 1C displays the current time.
2. Lock and unlock