EasyManua.ls Logo

Rutland 913 - Check You Have Received; What You Will Need

Default Icon
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rutland 913 Windcharger Owner’s Manual
Document SM-130 Issue G 26.10.06 4 Marlec Engineering Co Ltd
CHECK YOU HAVE RECEIVED
• 24 x No. 10x25mm special self-tapping screws
• 1 x fuse and fuse holder
• 1 x main generator assembly
• 6 x aerofoil blades
• 1 x nose cone + 3 x nylon fixing screws
• 1 x 6mm Allen key
• 1 x 2-way terminal block
• 2 x M10 buttoncap screws
• 2 x shakeproof washers
• HRS913 Regulator (USA “Mariner’s Package” only)
• 600mm (23 ½”) Stainless Steel Tube (USA “Mariner’s Package” only)
In the event of loss or damage, consult your dealer or the manufacturer.
WHAT YOU WILL NEED
Tools
• Suitable wire stripper
• Small terminal screwdriver
• Large flat blade screwdriver
• Crosshead screwdriver
Other Items You Will Need
• Mounting pole
• Cable
• Batteries
• Battery terminals
• Connector blocks (as determined by your total system)
Other Items You May Have Selected
• HRS913 Regulator or HRDX Charge Controller
• Cable
• Rutland 913 Marine Mounting Kit (Part No: CA-12/02)
• Rutland 913 Land Tower & Rigging Kit (Part Nos: CA-12/08 & CA-12/07)
• Short section of stainless steel tube to adapt into your own mounting design.
• Voltmeter & Ammeter

Related product manuals