EasyManua.ls Logo

Salus ST620WBC - Mounting the RF Integral Boiler Control to the Boiler

Salus ST620WBC
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting the RF Integral Boiler Control to the boiler
DANGER!
24V & 230V: Do not Touch Electrical Components or circuits
Isolate mains electricity supply before starting any work
and observe all relevant safety precautions
Follow electro static discharge precaution.
Do not touch any visible PCB parts or components.
1. Switch off the boiler at its main supply. Remove the outer casing and front
fascia to allow access to the main control panel.
2. Remove cover panel A upwards to remove.
3. Pull top tab B upwards, then outwards to remove blanking plate or existing control.
Now you are ready to fit your Salus integral RF boiler control
9ST620WBC INSTRUCTION MANUAL
B
A
Salus ST620WBC Manual 013_89 09/02/2012 14:01 Page 9

Related product manuals