EasyManua.ls Logo

Salus SunCube - Final Test of the Electrical Installation Connections; Electrical System Testing

Salus SunCube
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUN_IS_ electrical_installation_v5.1_06092021
33
2. Connect the phase wires to the contactor in place of the wires you removed, remember to insert
the black wire from the photo above.
3. Using the 400 V junction block, connect the wires from the box to the wires from cable "5"
(blue and green).