Installation
WARNING
• Connect the wires firmly so that wires cannot be
pulled out easily. (If they are loose, it could cause
burn-out of the wires.)
Step 2.4 Optional: Extending the
power cable
1 Prepare the following tools.
Tools Spec Shape
Crimping pliers MH-14
Connection sleeve
(mm)
20xØ7.0
(HxOD)
Insulation tape
Width 18
mm
Contraction tube
(mm)
50xØ8.0
(LxOD)
2 As shown in the figure, peel off the shields from the
rubber or wire of the power cable.
• Peel off 20 mm of cable shields from the
preinstalled tube.
CAUTION
• For information about the power cable
specifications for indoor and outdoor units, refer to
the installation manual.
• After peeling off cable wires from the preinstalled
tube, insert a contraction tube.
Power cable
Pre-installed tube for the power cable
(Unit: mm)
(Unit: mm)
20 20
20
20
60
120
180
3 Insert both sides of core wire of the power cable into
the connection sleeve.
• Method 1: Push the core wire into the sleeve from
both sides.
• Method 2: Twist the wire cores together and push
it into the sleeve.
Connection sleeve Connection sleeve
Method 1 Method 2
4 Using a crimping tool, compress the two points and
flip it over and compress another two points in the
same location.
• Thecompressiondimensionshouldbe8.0.
Compression
dimension
• After compressing it, pull both sides of the wire to
make sure it is firmly pressed.
Compress it 4 times.
5 mm
Compress it 4 times.
5 mm
Method 1 Method 2
5 Wrap it with the insulation tape twice or more and
position your contraction tube in the middle of the
insulation tape.
Three or more layers of insulation are required.
Method 1 Method 2
Insulation tape
40 mm
35 mm
Insulation tape
6 Apply heat to the contraction tube to contract it.
Contraction tube
7 After tube contraction work is completed, wrap it with
the insulation tape to finish.
Insulation tape