EasyManua.ls Logo

Samsung AR TSFY Series - Page 10

Samsung AR TSFY Series
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Preparation
English
Installation
7 Check the condition of the product periodically.
Check the installation site every 3 months and
perform anti-corrosion treatment such as R-Pro
supplied by SAMSUNG (Code : MOK-220SA) or
commercial water repellent grease and wax, etc.,
based on the product condition.
When the product is to be shut down for a long
period of time, such as off-peak hours, take
appropriate measures like covering the product.
8 If the product installed within 1640.4 ft (500 m) of
seashore, special anti-corrosion treatment is required.
࢜ťʪɇϑʪʀͱϩɇʀϩцͱЇθͱʀɇƊđƊƸĘθʪΧθʪϑʪϩɇϩЭʪ˙ͱθ
further details.
Sea breeze
Sea breeze
Sea
Sea
Outdoor
unit
Outdoor
unit
Outdoor
unit
Sea breeze
Protection wall
Sea
Outdoor
unit
Outdoor unit
Protection wall should be constructed with a solid
material that can block the sea breeze and the height
and width of the wall should be 1.5 times larger
than the size of the outdoor unit. (You must secure
ͱθʪϩ˵ɇߤߤ߫ߨ࢏ߨ˙ϩ࣑ߩߢߢ࣒ͱ˙ϑΧɇʀʪɵʪϩиʪʪϩ˵ʪ
protection wall and the outdoor unit for air circulation.)
Minimum clearances for the outdoor unit
Legends:
Wall
Minimum clearance in inch (mm)
23.6
(600)
11.8
(300)
Air flow direction
Top view Side view
Examples for installing one outdoor unit:
Unit: inch (mm)
11.8
(300)
59
(1500)
11.8
(300)
5.9
(150)
23.6
(600)
78.74
(2000)
59
(1500)
19.6
(500)
11.8
(300)
59
(1500)
11.8
(300)

Related product manuals