EasyManua.ls Logo

Samsung AR18CSFCMWKNCV - Installation

Samsung AR18CSFCMWKNCV
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
100
11-5 Installation
11-5-1 Before Installation
Keep the air conditioner outlet and inlet free from its surroundings.In case of installation, keep
thesymmetryandxittopreventvibration.Thepipelengthshallmeetthestandardasfaras
possible.
11-5-2 Installation Procedure
■ Location
Install the product in an area to guarantee the best cooling eect, convenience of piping and elec
-
tric work, and inexistence of vibration or wind.
Wall Drilling
Drill the wall downward in a diameter of 60 to 65mm.
■ Fixing Indoor Unit & Outdoor Unit
Fix the air conditioner indoor unit securely to the wall. Secure the outdoor unit in a suitable
position.
■ Pipe Spooling & Connectingt
You shall cut the pipe with a pipe cutter and grind all the burrs of the cut surface. pipe expan-
sion may continue until the pipe surface becomes uneven or torn apart. Be sure to use a torque
wrench to tighten pipes or are nuts.
■ Leak Test
Put an inset gas like nitrogen in the outdoor unit pipe and put soap bubbles or other test liquids
on the pipe surface for the leak test.
■ Drain Hose Connecting
Install the drain hose downward to drain water naturally. Be sure to pour water into the hose to
check if it drains well.
■ Electric & Earth Work
Electric and earth work shall meet the “Electric Facility Technology Standard” and the “Internal
Wire Regulation” of the Electric Business Laws.
■ Inspection & Trial Run
Upon completion of the tests, you shall make a trial run while you explain the main functions of
theairconditionertonishtheinstallation.

Table of Contents

Related product manuals