Samsung Electronics
3. Preparation for Cabinet Installation
• Preparations Before Installation
20
① Remove the Box tape at the upper area and then open up the box. (Fig.2)
② Remove the Top–Cushion and hold the handle inside PE-Bag and pull out the set then remove PE bag.
(Fig.2)
③ Check whether there is any abnormality on the screen by connecting the power cable.(Fig.3)
※ Process of Screen check (Page.21)
Fig.1 Packing & Product
Fig. 2 Remove Al-Bag
Fig.3 Check the Screen
HANDLE
BOX
CUSHION-TOP
CUSHION-BOTTOM
LED-SET
SWITCH
Al-Bag