EasyManua.ls Logo

Samsung RHF025EE Series - Final Checks and Trial Operation

Samsung RHF025EE Series
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E-29
ENGLISH
Final Checks and Trial Operation
Check the follows after the installation.
Installation location and its strength
Inspection hole installation
Wiring
Insulation
Check the operating condition and damper operation.
- If an error occurs during trial operation, check out the wiring.
Turn off the sub power supply and carry out the wiring work again.
- After the trial operation, explain how to use the ventilator to the user and
hand over the product with the user’s manual.
Setup the ERV wired remote control Checks
Function Air volume Operating condition Damper operation
Heat-EX mode Turbo, High, Low
Check the airflow from
outdoor air suction duct
and air outlet is controlled
by Turbo, High, Low.
Located on the
corner (Open)
By-Pass mode Turbo, High, Low
Located on side
(Closed)
RHF_025EE_IM_E_27512_1.indd 29 2007-04-18 ソタネト 5:44:01

Related product manuals