EasyManua.ls Logo

Samsung SH09ZS8 - Page 32

Samsung SH09ZS8
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SAMSUNG | 31
INSTALLING
5
Installation Diagram of Indoor Unit and Outdoor Unit (Cont.)
5-2-6. Flare Modification
TOOLS USED
FLARE MODIFICATION PROCEDURE
1. Cut the pipe using a pipe cutter.
2. Remove burrs at the tip of the pipe cut.
3. Insert a flare nut into the pipe and modify flare.
Outer diameter A(mm)
ø6.35mm 1.3
ø9.52mm 1.8
ø12.7mm 2.0
90
D
A
Oblique
Roughness
Burr
Pipe
Reamer
* Unproper flaring
Inclined Surface
damaged
Cracked Uneven
thickness
CAUTION
Burrs not removed may result in leakage of gas.
DB98_08187A(1)_S_23~56 3/27/03 2:41 PM Page 31

Other manuals for Samsung SH09ZS8

Related product manuals