EasyManua.ls Logo

Samsung SH09ZS8 - Page 40

Samsung SH09ZS8
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SAMSUNG | 39
INSTALLATION
5
5-5. Checking and Testing Operations
To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating
correctly.
Checking and Testing Operations
1. Review all the following elements in the installation:
Installation site strength
Piping connection tightness to detect any gas leakages
Connection wiring
Heat-resistant insulation of the piping
Drainage
Earthing wire connection
Correct operations (follow the steps below)
2. Press the On/Off button.
3. Press the button.
4. Air flow direction
Press the button and check that the air flow blades work properly.
Result
The indicator lights on the indoor unit flash at half-second intervals.
While the indoor unit opens, the indoor unit fan runs to start.
Result
The outdoor unit operates in cooling or heating mode as following the
room temperature.
DB98_08187A(1)_S_23~56 3/27/03 2:41 PM Page 39

Other manuals for Samsung SH09ZS8

Related product manuals