3-8
3. Disassembly and Reassemble
Description & Screws Picture Description
11-2
Discharge Capacitors
65"
You have to discharge the SMPS by using
service JIG across leads of Large Capacitors as
pictured below.
If LED ON -> LED OFF, Discharge is completed.
Then verify voltage is less than 10Vdc across
leads with Volt Meter.
Service Jig-Capacitor Discharge
• If LED ON £ LED OFF discharge is
completed.
BN81-16292A
<Before discharging> <After discharging>
LED ON
LED OFF
9 Then verify voltage is less than 10Vdc across
leads with Volt Meter.
Measurement point
11-3
Discharge Capacitors
70" / 75"
You have to discharge the SMPS by using
service JIG across leads of Large Capacitors as
pictured below.
If LED ON -> LED OFF, Discharge is completed.
Then verify voltage is less than 10Vdc across
leads with Volt Meter.
Service Jig-Capacitor Discharge
• If LED ON £ LED OFF discharge is
completed.
BN81-16292A
<Before discharging> <After discharging>
LED ON LED OFF
9 Then verify voltage is less than 10Vdc across
leads with Volt Meter.
Measurement point